Construction begins on Bank St

The big dig

1. THE PRELIMS. Greg Clark (left) and Shawn Ryan discuss the plan of action before retrieving 300 feet of cable stretching under Bank St between MacLaren and Somerset on May 15.

2. BREAKING GROUND. A backhoe digs into the corner of Bank and Somerset.

3. HARD DAYS NIGHT. Light falls as construction workers begin work on Bank. For the first few days, city crews closed Bank or reduced traffic — including diverting busses — outside of peak hours to avoid compounding the inconvenience.

Read More About:
Culture, News, Ottawa

Keep Reading

Josh Silver

‘Fruit Fly’ author Josh Silver has a sweet tooth—and the summer’s buzziest book

The English writer talks the duality of social media, how nursing helped his draft—and the cost of massive success

How ‘North of North’ is introducing Indigenous queer dramedy to a global stage

Actors Anna Lambe and Zorga Qaunaq on learning about forgiveness and queerness through their award-winning show
Barbara Hammer

Barbara Hammer’s endless influence

The lesbian filmmaker made a radical difference by making work that reflected her real life. A new documentary is cementing her legacy
Collage with two hands holding a bat, swinging towards a baseball with a dollar sign on it, against a blue background with a net, baseball player and the Olivia logo on an outfield sign

Why the WPBL partnering with a lesbian travel company matters

Support from lesbian brands and bars harks back to the queer history of women’s sport leagues
Advertisement